ServicesOur WorkAreasContactGet a Free Quote(720) 957-4377

What to Decide Before Finishing a Basement in Centennial

A basement finish is not one decision. It is about forty of them, and they do not all carry the same weight. A few set the price and the schedule before a single wall goes up. The rest can wait. Homeowners get into trouble when they spend months picking tile and no time on where the bathroom drain goes.

Here is what you need to settle before work starts, and what it costs you if you change your mind after.

The bathroom is the first decision, not the last

If you want a bathroom down there, the location is the single biggest item on the list.

Your drain line is in the concrete. If the spot you want sits over or near that line, the plumber cuts a trench, ties in, and patches. If it does not, the trench gets longer, or you end up with an ejector pit and a pump because the fixtures sit below the sewer line.

Some Centennial homes were built with a rough in already in the slab. Find out. A stubbed in drain in the right place saves real money. A stubbed in drain in the wrong place is worth very little, and people are often disappointed by that.

Decide before work starts: bathroom or no bathroom, where it sits, and whether it has a shower or just a toilet and sink. A shower adds a pan, a valve, waterproofing, and usually more concrete work.

Change it after the concrete is cut and patched and you are paying for demolition of work you already bought.

Bedrooms mean egress, and egress means digging

If any room in the plan is going to be called a bedroom, it needs an egress window and a window well sized to code. That is an exterior job. Someone cuts the foundation wall, digs, sets the well, and reworks grading and landscaping around it.

This is not a small line item, and it is not a decision you can reverse cheaply. Adding one after the basement is framed and drywalled means cutting back into finished work from the inside and digging again from the outside.

So answer this early, honestly: is this a den, or is it a bedroom someone will sleep in? If you are finishing with a future rental, a teenager, or a resale appraisal in mind, decide now.

Ceiling height and everything hanging from the joists

Walk the unfinished basement and look up. Ducts, beams, plumbing stacks, and electrical runs are all down there. Some of it can be moved. Some of it cannot, or can only be moved at a cost that makes no sense.

That hardware decides where your soffits go, which decides your ceiling height room by room, which decides where you can and cannot put a tall door, a bar, or a media wall.

Also look for a radon system, a sump pit, and a perimeter drain. Radon mitigation is common in this part of Arapahoe County. If a pipe runs through the middle of your planned open area, it can usually be rerouted, but that needs to happen before framing, not after.

The decisions that have to be locked before framing

These are the items that set the layout. Once walls are up and the framing inspection passes, changing any of them means tearing out work and calling for another inspection.

  • Where every wall goes, and how wide the doorways are
  • Bathroom location and fixture layout
  • Whether a wet bar or kitchenette is in the plan, since it needs its own supply, drain, and circuits
  • Stair treatment, including whether you are opening a wall or changing the railing
  • Where the mechanical room ends and the finished space begins, with required clearance around the furnace and water heater
  • Whether the ceiling is drywall or a drop ceiling, since that changes how much access you keep to pipes and valves

What changing your mind costs at each stage

The honest answer is that it goes up fast, and not in a straight line.

During design, before permit, changes cost you drawing time. That is the cheapest it will ever be. Move walls around on paper as much as you want.

After the permit is issued, a layout change can mean a revision submitted to the city and a wait for approval. You lose days, sometimes more.

After framing and rough in, you are paying for demolition plus the original work plus the new work. A wall that moves two feet also moves the electrical in it, the duct through it, and the inspection that already passed.

After drywall, every change is surgery. Cutting in a new outlet or a new can light means patching, texture matching, and repainting a wall or a ceiling that was finished.

After paint and trim, a change to anything structural or mechanical usually costs more than it did the first time around, because now there is finished work to protect and repair.

What makes one basement cost more than another

In plain terms, the drivers are square footage, the number of plumbing fixtures, whether an egress window is needed, how much duct and pipe has to be rerouted, ceiling type, and the level of finish you choose on flooring, trim, and tile. A large open space with no bathroom is on the low end of the range for its size. A smaller basement with a full bath, a wet bar, and an egress window will cost more than a bigger one without them.

Before you call anyone

Walk the space. Take photos of the ceiling, the mechanical room, and every window. Find your original house plans if you have them. Write down what the space is actually for, in one sentence.

Then decide the three big ones: bathroom or not, bedroom or not, and open plan or divided rooms. Bring us that, and the rest of the conversation gets much shorter and much more accurate.

More about this work

All posts

Call (720) 957-4377Get a Free Quote